Marshall Medical Center North

Guntersville, AL

Hardy Corporation installed the 500 ton HVAC system and plumbing when this 91-bed hospital was built in 1990, and has returned to install several renovations and additions. In 1997, Hardy Services upgraded the temperature controls from pneumatic to DDC and retrofitted the interior lighting for energy savings.

“We talked with other companies, but felt that Hardy’s approach was more comprehensive. They spent a lot of time working with our staff determining the best solution and way to best take advantage of the energy reduction opportunities.”
Joseph L. Harris, Jr., Asst. Administrator, Marshall Medical Center – North

Callahan Eye Foundation

Birmingham, AL

Lobby renovations in 2001 included new air handling units, duct systems, fan coil units, VAV’s, pumps, and a hot water converter. This project received a 2001 Associated Building Contractors “Award For Excellence”.

“I would like to take this opportunity to commend Hardy Corporation…for their cooperation with a difficult situation and the quality with which they performed their duties.”
Ed Bruton, Director Plant Operations, Callahan Eye Foundation Hospital

South Carolina Heart Center

Columbia, SC

This healthcare center covers 66,200 S.F. and has four (4) floors. The design for the HVAC called for 203 tons and 81,750 CFM. The original design was based on water source heat pumps located above the ceiling. Hardy’s redesign of the cooling system called for air cooled chillers and fan coil units. This eliminated the compressor noise from the ceiling and saved over $80,000 on the HVAC installation.

St. Vincent’s South Tower

Birmingham, AL

St. Vincent’s Ortho Sports Center

Birmingham, AL

East Alabama Medical Center

Opelika, AL

“Hardy has been very helpful to us on our construction projects. They go beyond the specific scope of their work and help us look out for problems. I rate them A+ and recommend them.”
Ralph C. Graham, Director of Engineering, East Alabama Medical Center, Opelika

St. Vincent’s Women & Children’s Center

Birmingham, AL

St. Vincent’s Hospital North Tower

Birmingham, AL

Hardy’s contract totaled just under $5,000,000 for this 136,000 SF Hospital. Design Build services were provided for the POB portion of the building (88,000 SF). All HVAC equipment was provided and installed by Hardy including 225,000 pounds of duct, (2) 350 ton chillers, (2) 70 ton cooling towers, (8) pumps, (2) 125 HP Boilers and (6) Steam sterilizers.

“Hardy Corporation is currently performing projects in several areas of the hospital and we are pleased with their dependability and workmanship.” John S. Taylor, Facility Maintenance Manager, St. Vincent’s Hospital

Children’s Hospital of Alabama

Birmingham, AL

Hardy served as the “design assist” mechanical contractor for this new 763,495 SF hospital. The final contract reached $57,876,465 for the entire HVAC and Plumbing package (including medical gas). The scope included over 84 miles of piping and 1,500,000 pounds of duct fabricated and installed by Hardy. This building is on target to achieve a LEED certification at project completion. At the peak of the project schedule, Hardy employed over 250 personnel dedicated solely to this project and managed another 200 people at a subcontractor level.

UAB Women & Infants Center

Birmingham, AL

Hardy served as the Design Build Mechanical Contractor for this new 630,000 SF Hospital. The systems installed by Hardy included all plumbing, medical gas and HVAC systems.