Homewood, AL
This design-build project included remodeling of current HVAC and addition of new equipment. Air distribution was changed and enhanced. The job included one (1) 15 ton chilled water AHU and one (1) 5 ton chilled water AHU. It also involved installation of two (2) kitchen hoods, grease duct, and three (3) exhaust fans.