This healthcare center covers 66,200 S.F. and has four (4) floors. The design for the HVAC called for 203 tons and 81,750 CFM. The original design was based on water source heat pumps located above the ceiling. Hardy’s redesign of the cooling system called for air cooled chillers and fan coil units. This eliminated the compressor noise from the ceiling and saved over $80,000 on the HVAC installation.