This world class museum spans 133,000 SF and 4 floors. The museum boasts the largest collection of specialty motorcycles in the world. Hardy provided 180,900 CFM of HVAC cooling including (2) 300 ton air cooled chillers,( 6) AHU’s with energy recovery ventilators, (19) electric duct heaters, (2) chilled water pumps, ( 20) VAVs, 101,000 lbs of double wall spiral, 22,400 lbs of sheet metal duct and a customized DDC control system to keep the museum at optimal environmental conditions.