Hardy provided HVAC and Plumbing services for this LEED Gold Certified library. The HVAC system includes (4) central station AHUs serving an under floor VAV air distribution system. The 35,000 SF facility also includes (1) chiller, (3) fan coil units, (1) computer room unit, (2) boilers, 30,000 lbs of sheet metal duct, and multiple piping systems such as hot water, chilled water, sanitary, storm and domestic water.