Covering 3 floors and 140,000 S.F., the Museum of Art is one of Birmingham’s most visited museums. Hardy installed a 650 ton centrifugal chiller, VAV units, reheat coils, dehumidifiers, and eight (8) AHU’s with 230,000 CFM of air.