St. Vincent’s South Tower

Birmingham, AL

St. Vincent’s Ortho Sports Center

Birmingham, AL

East Alabama Medical Center

Opelika, AL

“Hardy has been very helpful to us on our construction projects. They go beyond the specific scope of their work and help us look out for problems. I rate them A+ and recommend them.”
Ralph C. Graham, Director of Engineering, East Alabama Medical Center, Opelika

St. Vincent’s Women & Children’s Center

Birmingham, AL

St. Vincent’s Hospital North Tower

Birmingham, AL

Hardy’s contract totaled just under $5,000,000 for this 136,000 SF Hospital. Design Build services were provided for the POB portion of the building (88,000 SF). All HVAC equipment was provided and installed by Hardy including 225,000 pounds of duct, (2) 350 ton chillers, (2) 70 ton cooling towers, (8) pumps, (2) 125 HP Boilers and (6) Steam sterilizers.

“Hardy Corporation is currently performing projects in several areas of the hospital and we are pleased with their dependability and workmanship.” John S. Taylor, Facility Maintenance Manager, St. Vincent’s Hospital

Children’s Hospital of Alabama

Birmingham, AL

Hardy served as the “design assist” mechanical contractor for this new 763,495 SF hospital. The final contract reached $57,876,465 for the entire HVAC and Plumbing package (including medical gas). The scope included over 84 miles of piping and 1,500,000 pounds of duct fabricated and installed by Hardy. This building is on target to achieve a LEED certification at project completion. At the peak of the project schedule, Hardy employed over 250 personnel dedicated solely to this project and managed another 200 people at a subcontractor level.

UAB Women & Infants Center

Birmingham, AL

Hardy served as the Design Build Mechanical Contractor for this new 630,000 SF Hospital. The systems installed by Hardy included all plumbing, medical gas and HVAC systems.

Grandview Medical Center

Birmingham, AL

UAB Shelby Biomedical Center

Birmingham, AL

Hardy provided all shell HVAC and Plumbing systems for this 14 floor, 345,000 SF medical research facility. The systems installed included 240,000 lbs of sheet metal duct, chilled water piping, steam piping, (8) heat exchangers, (16) pumps, (10) AHUs, sanitary, storm, domestic water, acid waste, lab water, compressed air and vacuum piping.

Samford University Food Court

Homewood, AL

This design-build project included remodeling of current HVAC and addition of new equipment. Air distribution was changed and enhanced. The job included one (1) 15 ton chilled water AHU and one (1) 5 ton chilled water AHU. It also involved installation of two (2) kitchen hoods, grease duct, and three (3) exhaust fans.

Successful projects, satisfied clients.