Double Wall Spiral/Rectangular

Double-wall duct pairs a solid outer wall with an insulated inner liner, often perforated for sound control. Hardy fabricates double-wall spiral and rectangular duct and fittings for exposed duct, noise-sensitive spaces and runs that need thermal insulation. The result is a clean, finished look with no exposed wrap.

Drain Pans

Drain pans catch condensate and leaks under coils, air handlers, fan coils and water heaters before they damage what’s below. Hardy fabricates drain pans from galvanized steel, stainless or aluminum, sized to the equipment and sloped to drain. Each pan is built with drain connections where the piping needs them.

Curbs

Roof curbs support rooftop units, exhaust fans and duct penetrations and give the roofer a clean surface to flash to. Hardy fabricates equipment and duct curbs sized to the unit and the roof slope. Curbs ship ready to set, so the roof can be dried in on schedule.

Blockout

Blockouts are sheet metal boxes set in the forms before a pour to leave clean openings for duct and pipe. Hardy fabricates blockouts to the sizes and locations on the drawings. Planning openings before the pour avoids coring and saw-cutting later.

Sleeve Penetration

Where duct passes through a wall, a sheet metal sleeve frames the opening and gives a clean edge for sealing or firestopping. Hardy fabricates wall penetration sleeves sized to the duct and the wall thickness. They can be set during framing or block work, so openings are in the right place before finishes go up.

Sleeves

Pipe sleeves set in walls, floors and decks protect piping where it passes through and keep openings consistent for sealing and firestopping. Hardy fabricates sleeves to the pipe sizes and penetration locations on the drawings. Sleeves are delivered in time to set before the pour or before walls close.

State Farm Regional Headquarters

Birmingham, AL

Hardy installed HVAC and plumbing for State Farm’s new Alabama-Mississippi regional headquarters including 1,575 tons of cooling. Phase II (adding 50,000 SF) included mechanical additions and renovations.

APCO Credit Union (LEED Certified)

Birmingham, AL

This new bank and office building spans 55,000 SF and 3 floors. Hardy provided all required HVAC systems including (3) SWUDs, (53) VAVs with electric heat, (2) computer room units, (2) energy recovery units, (2) mini split systems, (1) closed circuit cooling tower, (4) pumps and over 30,000 lbs of sheet metal duct. The building achieved LEED Certification.

Navistar International

Huntsville, AL

Navistar was a 510,200 square foot design-build project by Hardy. The installation of the 450 tons of HVAC was extremely difficult because the manufacturing equipment had been completed prior to our work. All ducts were hung 30’ over the manufacturing equipment. This project received a 2001 ABC Award for Excellence.

“Coordination of the new installation required extensive field review to determine elevation, routing and coordination with the electrical, fire protection, process piping and existing roof support structures. With the cooperation and dedication of the Hardy forces, the duct work system was installed on time and within budget… Our recognition of your efforts is evidenced by our continued business relationship.”
James P. Anderson, Brasfield & Gorrie, LLC

Mercedes-Benz Service Center

Vance, AL

This 150,000 S.F. corporate facility included 540 tons of cooling, two (2) hot water boilers, 16 air handling units, 80 variable air volume (VAV) zones, direct digital controls, and a unique air duct system that followed the undulating shape of the roof.

Successful projects, satisfied clients.