This central plant upgrade was contracted as part of the Science and Engineering Complex, Phase 2 project. The scope included (2) 1,000 ton water cooled chillers, (1) 4,000 KW electric boiler, (2) 1,020 ton cooling towers, (14) pumps, (2) heat exchangers, fuel oil system upgrades, relocating (3) existing 1,000 ton cooling towers, chilled water piping, hot water piping, DDC control upgrades and approximately 2,000 feet of underground 32” HDPE condenser water pipe.