Tuscaloosa News

Tuscaloosa, AL

Hardy provided all HVAC and Plumbing systems for this Tuscaloosa business. The mechanical system required a complex system of process piping including reverse osmosis, ink, gas and compressed air piping. Much of the plant required exposed duct to be installed over the printing equipment. The 95,000 SF building also required 313 tons of cooling, (8) pumps, (14) fans, (25) hoods, (2) ink filters, (2) gas boilers, (2) chillers, (2) cooling towers and (1) humidifier.