Toyo Tire

White, GA

Hardy supplied all HVAC and Plumbing services for this 876,000 SF manufacturing facility in Northwest Georgia. The systems installed include 1,743 tons of cooling, (51) RTUs, (47) fans, (18) gas heaters, (10) make-up air units, (37) VAV boxes and approximately 100,000 pounds of sheet metal duct. One unique aspect of the project included a high tech test building for the owner to perform strict tolerance tests on new tires. Hardy provided and installed the mechanical systems for this building including an air cooled chiller, custom air handlers, multiple duct mounted coils, a gas boiler, multiple pumps and the associated chilled water and hot water piping.