Perimeter Church
Duluth, GA
Hardy’s work on this 171,000 S.F. church included 236 tons of air conditioning, one (1) hot water boiler, and eight (8) air handling units.
Duluth, GA
Hardy’s work on this 171,000 S.F. church included 236 tons of air conditioning, one (1) hot water boiler, and eight (8) air handling units.