JCIM (formally Plastech)

McCalla, AL

Hardy provided the HVAC for this 294,000 SF warehouse and manufacturing facility. The system included 40 tons of cooling, gas heat, (6) RTU’s, (4) split DX systems, (2) MUA units and (37) roof fans which were set on the roof via helicopter.