Gordon Persons State Office Building

Montgomery, AL

Plumbing and HVAC systems were installed by Hardy in this 600,000 S.F. state government office building. Equipment included two (2) centrifugal chillers totaling 1,650 tons, two (2) steam boilers, 10 pumps, 35 air handling units, 780 variable air volume (VAV) zones, and direct digital temperature controls. Plumbing included water and sanitary sewer systems, and storm water drainage.