Gestamp Automocion Manufacturing

McCalla, AL

(formally Oxford Automotive)

Hardy provided design build mechanical services for this 400,000 SF manufacturing facility. The project required a vast range of engineering applications including air filtration of welding smoke, chilled water piping, process water piping, condenser water piping, gas piping, compressed air system, office and training facilities, assembly area, stamping area, quality control lab with (2) computer room AC units, multiple mechanical rooms, approximately 25,000 feet of piping and over 130,000 lbs of sheet metal duct. The design included variable flow chillers and a water side economizer to increase building operation efficiency. The building also includes a state of the art building management system. All programming and graphic controls were designed and installed by Hardy. This project won an ABC Excellence in Construction Award at the State and National level.