Brookwood Village Mall

Birmingham, AL

Hardy installed the original HVAC systems including two (2) 600 ton chillers in the 1973 construction for this 500,000 S.F. mall. In 1997, Hardy replaced the original chillers with two (2) new 800 ton machines. In 2000, Hardy performed extensive mall renovations and expansions.