Jefferson State Community College Multipurpose Building

Birmingham, AL

Hardy provided and installed the HVAC system for this 170,000 SF educational building. The building contains academic classrooms, a meeting hall, culinary teaching facilities, chemical labs, administrative offices and a conference facility. Some of the equipment installed included (2) chillers, (13) AHUs, (4) 100% outside air units, (16) fan coil units, (2) gas boilers, (11) hoods, (4) pumps, (109) VAV units, (15) VFDS, 265,500 lbs of sheet metal duct and 14,150 feet of piping.

Successful projects, satisfied clients.