Village Creek Waste Water Peak Flow Generation Building

Birmingham, AL

The peak flow generation building was designed and constructed to help alleviate the yearly flooding from parts of Birmingham that occur during heavy rains. Hardy installed custom-made exhaust stacks on the (8) 4,500 HP generators. The stacks are 34” in diameter, stainless steel and double wall construction. The stacks run over 80 feet above the ground. All vents required strict installation tolerances in order to meet numerous structural requirements.