University Park Building 600

Birmingham, AL

Hardy installed 400 tons of air conditioning including five (5) water-cooled package units, two (2) cooling towers, six (6) pumps, one (1) heat exchanger, 30 PIU/variable air volume boxes, and direct digital controls.