UAB Southeastern Bio-Safety Lab (SEBLAB)

Birmingham, AL

Hardy provided HVAC services for this UAB Southeastern Bioterrorist Laboratory. The building spans 17,500 SF and 3 Floors. The building includes a Bio Safety Level 3 System with 100% OA & 100% Exhaust with HEPA filtration. Fully welded and tested stainless steel duct was required for most of the labs inside the building. Other components of the system include hot water piping, steam humidification, chilled water piping, (4) AHUs, (3) boilers, (4) pumps, (2) heat exchangers and (139) VAV boxes.