UAB Shelby BioMedical Center

Birmingham, AL

Hardy provided all shell HVAC and Plumbing systems for this 14 floor, 345,000 SF medical research facility. The systems installed included 240,000 lbs of sheet metal duct, chilled water piping, steam piping, (8) heat exchangers, (16) pumps, (10) AHUs, sanitary, storm, domestic water, acid waste, lab water, compressed air and vacuum piping.