UAB Blount Hall

Birmingham, AL

Hardy provided the HVAC for this 277,500 SF, 8 floor student dorm. The HVAC system included  367 tons of cooling, (187) Fan Coil Units, ( 5) Pumps, (2) air cooled chillers, (6) Packaged HW Boilers, (4) Pipe System and 69,000 lbs of sheet metal duct.