Sheraton Hotel & Ballroom, BJCC

Birmingham, AL

This renovation project required 314 tons of cooling and involved connecting new HVAC with existing equipment. The mechanical components installed by Hardy included six (6) AHU’s, one (1) MUA, new boiler vents, new boiler feedwater, two (2) pumps, thirty-six (36) HW heating coils, five (5) HW UH’s, twenty-five (25) exhaust-supply fans, 25,000 lbs of spiral duct and 55,500 lbs of rectangular duct.