Regions Operations Center

Birmingham, AL

This operations office and data center covers 300,000 SF and 3 Floors. The central plant boasts 1,185 tons with (3) chillers, (3) cooling towers, (8) pumps, (1) heat exchanger and an above ground fuel oil system with a fuel storage tank. Hardy provided all HVAC systems including (263) VAVs, (11) AHUs with energy recovery coils and humidifiers, 140,000 lbs of double wall spiral and 87,000 lbs of sheet metal duct.