Oak Mountain Presbyterian Church

Birmingham, AL

(Sanctuary and Education Building)

Hardy provided HVAC mechanical services for this church expansion project. The project included over 7,000 feet of underground HVAC piping. Reducing HVAC noise was a critical design component of the system. Special sound attenuators were provided and installed by Hardy to reduce fan noise. The project included (1) chiller, (3) AHUs, (3) boilers, (5) pumps, (21) fans and 80,000 lbs of sheet metal duct.