Medical Center East

Birmingham, AL

Hardy added a 250 ton centrifugal chiller to supplement the central plant, and installed the central air handling unit, medium-pressure duct, and VAV boxes with hot water reheat serving the new 75,000 S.F. Patient Tower. Hardy also installed the air handler and VAV boxes serving the operating room build-out, and the roof-mounted 10 ton AC unit serving the heart catherization lab. Other work included the installation of water source heat pumps with hot water heat and low pressure air distribution system for the tenant build-out of the medical office building suites.