Enterprise High School

Enterprise, AL

Hardy furnished and installed the HVAC system for this new 3 story, 350,000 SF high school. The building includes a water source heat pump system with 1,120 tons of cooling and 186 units providing 433,000 CFM. The other equipment installed includes (19) RTUs, (3) split systems, (3) evaporative coolers, (6) pumps, (21) electric unit heaters, (3) electric boilers, (146) fans, (2) hoods, 272,000 lbs of sheet metal duct and 67,600 SF of duct liner.