Consolidated High School Phase II

Gadsden, AL

Hardy provided all HVAC systems for this new 321,800 SF high school. The mechanical system includes (48) DX gas RTUs, ( 131) Water source heat pumps, (6) dessicant units, (4) 100 % outside air units, (3) closed circuit cooling towers, (4) boilers, (6) pumps and 187,000 lbs of sheet metal duct.