Baptist Medical Center, Princeton

Birmingham, AL

The central plant equipment installed by Hardy included (2) centrifugal chillers, (3) boilers, (6) pumps, and gas and fuel oil piping. The plumbing system included water and sanitary sewer systems and storm water drainage.